Portland-head-lighthouse.jpeg

Health Care Facilities

  • Project: York Hospital Medical Office Building
    Location: South Berwick, Maine
    General Contractor: Eckman Construction, Inc.
    System: 3-Story hot water/chilled water system with 2 chillers, 4 air handlers, 4 boilers.  New Construction. Completed 2012.

  • Project: Air National Guard – Medical Training Facility
    Location: Portsmouth, NH
    General Contractor: Brookstone Builders
    System: Hot water baseboard, DX cooling, reheat.
    New Construction 26,000 sq. ft.

  • Project: YMCA
    Location: Biddeford, Maine
    General Contractor: Owner
    System: Design build swimming pool dehumidification and controls.

  • Project: Southern Maine Medical Center
    Location: Biddeford, Maine
    General Contractor: Hodess Construction

  • Project: Rehab 3
    Location: Rochester, NH
    General Contractor: Horne Construction
    System: Rehab / Renovation

Heating | Air Conditioning | Refrigeration

Atlantic Comfort Systems, Inc
P.O. Box 665, 392 Hill Street, Biddeford, Maine 04005
(207) 284-6360 | Fax (207) 284-6377
Email: Matthew Tuller